Universal iOS & Android Tile CAD Simulator
One-time purchase • No subscription
Removes the banner and the occasional full-screen ad on this platform.
No subscription. Pay once, keep it — restore any time on the same store account.
Every feature stays available to everyone; Pro keeps the app ad-free and funds updates.
Architectural blueprint, sequential cut list, materials takeoff & quality checklist
Pre-calculated cut dimensions and saw rip fence settings for each border piece across the room.
| Course # | Piece Position | Cut Width × Length | Intact % | Wet Saw Fence Setting | Reverse-Cut Method |
|---|
| Material Item | Specification | Net Laid | Order Qty (w/ Waste) | Est. Cost |
|---|---|---|---|---|
| Total Estimated Materials Investment: | $845.00 | |||
Estimates only — not engineering advice. Verify all measurements on site and follow manufacturer instructions and local codes.
Prescribed Protocol: Fasten subfloor every 6" on edges with structural screws. Embed uncoupling membrane (Ditra) into modified thin-set. Maintain 1/4" perimeter expansion movement joints along all perimeter walls per TCNA EJ171.
Contractor takeoff sheet, tile quantities, grout & mortar specs
| Item Description | Specification | Net Laid | Order Qty | Est. Cost |
|---|---|---|---|---|
| Estimated Total Materials Cost: | $845.00 | |||
Bought the Universal Pass on another device or the web? Sign in with the TileCraft Universal ID shown there (TC-XXXX-XXXX-XXXX-XXXX).